Highland Water Reclamation Plant

2017-03-11T18:48:14+00:00

Highland Water Reclamation Plant Highland Illinois Spring 2000 Remodel/Upgrade Hardware: Interface: The Highland Wastewater Treatment facility was designed with a General Electric programmable controller and SCADA interface. The operation is staffed a single shift per day, 40 hours per week. The SCADA system was designed to alarm the on-call operator in the event of a

Consumers Illinois Water Co

2017-03-11T19:14:11+00:00

Consumers Illinois Water Co Candlewick, Illinois Jan. 1995 - Jan 2000 Remodel/Upgrade Hardware: Interface: Corsair Controls has been actively involved with this facility with the construction of a new wastewater treatment facility. The project encompasses a head works structure, sequential batch reaction structure (SBR's), traveling bridge sand filter structure, UV light system, and effluent pump

Aqua Illinois Water Co

2017-03-11T19:13:42+00:00

Aqua Illinois Water Co Sublette, Illinois Jan. 1995 - Jan 2000 Remodel/Upgrade Hardware: Interface: Corsair Controls has been actively involved at this facility for several years. We were involved when the plant was converted into a SCADA system using Square D programmable controllers. The system includes both the water treatment and waste water treatment facilities.

Aqua Illinois Water Co

2017-03-11T19:11:31+00:00

Aqua Illinois Water Co Galesburg, Illinois Feb. 1995 - Present Remodel/Upgrade Hardware: Interface: The facility consists of a single well to supply water to a treatment plant. The system controls the chemical treat and supply of water to an above ground storage tank. The control is by a Square D programmable controller (PLC) and a

Aqua Illinois Water Co

2017-03-11T19:10:57+00:00

Aqua Illinois Water Co Danville, Illinois Jan. 2000 - Jan 2004 Remodel/Upgrade Hardware: Interface: The water treatment facility added an ion exchange nitrate removal filtration system, and a new raw water intake structures and screens. The project upgraded the existing PLC equipment, operator interface system and integrated the new systems. The existing PLC equipment was

Go to Top